Big rock wranglin' is hard to do! Keith and Doug take on the task of getting the center stone in place.
|
|
|
 |
|
|
 |
|
|
Weekend 3. Keith working on cementing in the large center rock.
|
|
|
 |
|
|
|
Gene and Richad making the prefilters for the pond pumps.
|
|
|
 |
|
|
|
Can't forget to mortor in the spill rock on the left side pond. It may be big and heavy, but better safe than sorry.
|
|
|
 |
|
|
|
After the top stone was placed around the perimeter of the leftside pond, Doug works on the spill rock for even level and water distrubution.
|
|
|
 |
|
|
|
Randy joins in on the fray with Carlos as they begin to install valves and Ts into the flex tubing coming from the pond pump. To get a nice even flow and a interesting BUBBLING SPRING look, I took the pipe and positioned it in 2 places over the spill rock. Doing some fine tuning here.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|